提供Windows 11/10/7、Ghost镜像、驱动及常用软件下载与安装教程,并提供“装机大师”等一键重装工具 后台管理
📢 欢迎访问系统之家!所有资源均经过安全检测。

Zečeve Drage Viaduct

发布时间:2026-10-04 | 浏览:1
📥 下载地址(文章开头)
装机神器,安装一切系统。纯净版原版应有尽有!
The Zečeve Drage Viaduct is located between the Bosiljevo 2 and Vrbovsko interchanges of the A6 motorway in Gorski Kotar , Croatia , just to the west of the Veliki Gložac Tunnel . It is 939.2 metres (3,081 ft) long. The viaduct consists of two parallel structures: the first one was completed in 2004, and the second one in 2008. The viaduct is tolled within the A6 motorway ticket system and there are no separate toll plazas associated with its use. [ 1 ] The viaduct was completed by Viadukt . [ 2 ] [ 3 ] [ 4 ] Structure description At this location the motorway route follows a horizontal curve with a radius of 2,505.1 metres (8,219 ft) . The deck of the viaduct follows a 26,500-metre (86,900 ft) radius concave vertical curve, and the longitudinal grade of the road carried by the viaduct ranges from 4.38% to 0.78%. The viaduct is a box girder structure supporting the deck across nineteen spans: two of 40 m (130 ft) , sixteen of 50 m (160 ft) and one of 40 m (130 ft) . The viaduct piers range from 18.72 m (61.4 ft) to 53.04 m (174.0 ft) in height. The superstructure of the viaduct comprises a box cross section made from pre-stressed reinforced concrete, put in place by incremental launching due to the considerable height of the structure. The launching was carried out downhill, because of the substantial grade of the superstructure, with two VBT 19×140 cable stays as a braking mechanism for the 20,000 tonnes (20,000 long tons ; 22,000 short tons ) box girder. The cross-sections of the box girder and the piers are virtually identical to those of Bajer Bridge . [ 1 ] [ 2 ] [ 3 ] Traffic volumes are regularly measured and reported by Autocesta Rijeka – Zagreb , the operator of the viaduct and A6 motorway where the structure is located, and published by Hrvatske ceste . Substantial variations between annual ( AADT ) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries a large amount of tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales. [ 5 ] List of bridges by length 1 2 Croatian Motorways . Hrvatske autoceste . 2007. pp. 350– 351. ISBN 978-953-7491-09-3 . Archived from the original (PDF) on 2010-08-18 . Retrieved September 11, 2010 . 1 2 "Viaduct "Zečeve Drage" Rijeka-Zagreb highway" . Viadukt . Retrieved October 11, 2010 . 1 2 "Vijadukt Zečeve drage na autocesti Karlovac – Rijeka" [ Zečeve Drage Viaduct on Karlovac - Rijeka motorway ] (in Croatian). Gradimo. January 1, 2007. Archived from the original on September 14, 2010 . Retrieved October 11, 2010 . ↑ "Autocesta Rijeka-Zagreb" [ Rijeka-Zagreb motorway ] (PDF) . HUKA bulletin (in Croatian) (7). HUKA: 2. March 2006 . Retrieved October 11, 2010 . ↑ "Traffic counting on the roadways of Croatia in 2009 - digest" (PDF) . Hrvatske Ceste . May 1, 2010. Archived from the original (PDF) on July 21, 2011. This article about a bridge in Croatia is a stub . You can help Wikipedia by adding missing information . European bridge (structure) stubs Croatian building and structure stubs Box girder bridges in Croatia
📥 下载地址(文章中间)
装机神器,安装一切系统。纯净版原版应有尽有!
Bridges completed in 2004 Toll bridges in Croatia Viaducts in Croatia Buildings and structures in Primorje-Gorski Kotar County Transport in Primorje-Gorski Kotar County Pages using gadget WikiMiniAtlas Articles with short description Short description is different from Wikidata Coordinates on Wikidata Pages using infobox bridge with clearance CS1 Croatian-language sources (hr) All stub articles Pages using the Kartographer extension
📥 下载地址(文章结尾)
装机神器,安装一切系统。纯净版原版应有尽有!